A construction company can remove 2/3 tons of dirt from a construction site each hour. How long wil

Discussion in 'Calculator Requests' started by math_celebrity, Aug 31, 2018.

Tags:
  1. math_celebrity

    math_celebrity Administrator Staff Member

    A construction company can remove 2/3 tons of dirt from a construction site each hour. How long will it take them to remove 30 tons of dirt from the site?

    Let h be the number of hours. We have the following equation:
    2/3h = 30

    Multiply each side by 3:
    2(3)h/3 = 30 * 3

    Cancel the 3 on the left side:
    2h = 90

    Type 2h = 90 into the search engine, we get h = 45.
     

Share This Page